Home Shrewsbury Environmental Technology Centre
Passive Solar Design Water Conservation Renewable Energy Conserve Energy Biomas
 
 

The Pump House

  • Home
  • About
  • News
  • Design
  • Flexible Office Space
  • Space Available
  • Occupiers
  • Picture Gallery
  • Location
  • Links
  • Contact Us

Latest image

  • Front elevations without scaffolding
    Front elevations without scaffolding
more

User login

  • Request new password

Construction

  • Timber Frame and Central Core to ground floor
    Timber Frame and Central Core to ground floor
  • View from across the river
    View from across the river
  • Timber Frame startsto be erected
    Timber Frame startsto be erected
  • Brickwork
    Brickwork
  • I Beam Floor Installed in Building A
    I Beam Floor Installed in Building A
  • View From Building A over River Severn
    View From Building A over River Severn
  • Steel Beams awaiting I beams to form first flor
    Steel Beams awaiting I beams to form first flor
  • Basement Walls and Pellet Store
    Basement Walls and Pellet Store
  • Lift Pit and Slab about to be cast
    Lift Pit and Slab about to be cast
  • Foundations
    Foundations
  • Foundations
    Foundations
  • Preparation for foundation
    Preparation for foundation
« first‹ previous1234next ›last »
© 2007 SETC. Web design by The Web Orchard.